Ecology, Flood Risk & Rainwater Attenuation

An important part of the planning application process is the Ecology of the site, flood risk and Attenuation of water flow and storage.

The ecological value of your site is affected by previous uses and the presence of existing features such as trees, hedges, watercourses, wetlands, meadows, etc. Wherever homes are constructed, there is always a risk that however environmentally friendly the building or development itself is, it may still present a threat to local ecology, areas of natural beauty and municiple systems.

The principle here is to minimise the damage ot existing local ecology and then, where possible, to enhance it. For more information on this service contact Abba directly or fill out our enquiry form.
"Abba Energy joined our project team and efficiently provided guidance to achieve the CSH (Code for Sustainable Homes) target we were working towards. We subsequently received the certification required - a successful conclusion and look forward to the next project with Abba." - BTP Group

Sensible Energy Saving Tip

A photocopier left on overnight uses enough energy to make 1,500 photocopies. Lighting an average-size office overnight wastes enough energy to heat water for 1000 cups of tea. Make sure the last one to leave the office switches off.

New Build or Domestic Refurbishment? Call Abba Energy on 020 8208 8333 for expert advice on Sustainable Housing Design and Construction.